Aidanfield is a series of subdivisions begun in 2001, and which now constitutes an entirely new residential suburb in its own right. The earthworks component of this project was extensive – stage 2 alone saw 125,000m3 of material transferred.

Work across all stages included the formation of swale drains, footpaths and berms, carriageway construction, and the installation of sewer mains, laterals and services. The seventh stage saw the construction of two bridges as part of the road network. Paved thresholds and stonework requiring a high degree of finishing quality also feature in the work at this prestigious residential subdivision.

Gallery

coming soon..